I had to add an extra floor cleat to support the floor boards. I purchased the timber package, but my floor boards seem to be about 3/4" too short. Not sure how that happened, but I have decided to add another clear to bulkhead #8 to support the floor boards. I figured there would not be a lot of pressure back there from someone's weight and you really would not see it, since it will be out of the way.
I added a cleat to the front of the cleat that was already installed on bulkhead #8. This will allow me something to support the floor boards since they are too short. I have a work light to help the fillets cure since it is starting to drop in temperature in the garage.
Added cleat curing with work light. |
I started to sand the port side in preparation for painting. |
No comments:
Post a Comment